Case Studies
We have carried out extensive regeneration
and new build works in the South East of England to
properties owned by Local Authorities, HM Courts,
Schools, Social Landlords and Private Landlords.
Ark Build has demonstrated the ability to deliver
significant works programmes and we are pleased to
provide examples below.
|
 |
|
Southern Housing Group
The project
David Smith Court consists of 3 storey care assisted sheltered accommodation in Reading.
The works include internal repairs to improve the individual units and the upgrade of heating systems and existing cold water systems.
Work to the individual units includes;
• New kitchens
• New bathrooms
• Partial internal re-wire
• Heating works
Works to the communal areas includes;
• Communal toilets
• Wet room showers
• Assisted bathing rooms
• Catering kitchens
|
|
|
 |
|
2 – 5 College Approach Greenwich
The
project
Refurbishment, conversion and extension of 4 Grade II listed buildings consisting of Basement, Ground and 3 Upper Floors.
The works included strip out existing fixtures and fittings, new mechanical and electrical services, construction of roof dormer windows, new kitchen and wc’s and decorations.
Situated within the World Heritage Site boundary of Maritime Greenwich the site is a bustling commercial and tourist area and all works had to be programmed in a manner sympathetic to the constraints of the location.
.
|
|
|
 |
|
Milton House
The
project
Refurbishment to Milton House. Formerly Haywards Heath County Court it is now used as offices by HMCS.
The building remained occupied and in use during the refurbishment works. We carried out the alterations on a floor by floor basis, with staff being decanted to other floors and then re-instated.
Achieving programmed completion stages was essential to the client and liaison with the building users was paramount to achieving this.
Careful segregation was required and the works were carried out in separate phases detailed in floor by floor plans attached to the Health & Safety Plan. Exclusion zones were set up around all areas of work, which included all relevant signage, barriers, tape and operatives as required. |
|
|
 |
|
54 Cranley Gardens – Refurbishment works
The
project
Refurbishment of a Grade II listed building, which involved the high quality conversion of the existing property into 3 bedsits, 1 flat and a maisonette.
The works included complete external refurbishment redecoration including restoring and refurbishing existing timber double hung sash windows.
The internal works included high efficiency sound insulation, tanking existing basements, structural repairs, new high quality kitchens, bathrooms, redecoration, heating, electrical installations and external landscaping.
Particular attention was paid to restoring existing period features, plaster repairs in matching materials and restoring existing staircases.
Results
A high quality conversion using both traditional and modern materials and techniques completed within budget and ahead of programme.
Ark Build scored an excellent 35 points out of 40 for the Considerate Constructors Scheme whilst carrying out this high quality refurbishment working in close proximity to existing residents.
|
|
|
|
 |
|
The Royal London Pension Fund – Refurbishment Works, Eastleigh
The project
Complete refurbishment of existing retail units during a twenty six week period, commencing January 2009 and ending June 2009, to a high ecological standard.
Works included total refurbishment of existing Industrial units and offices. The works included the replacement of existing roofs with new high insulation roofing, new electrics to comply with IEE 17th Edition, complete redecoration, new high security metal palisade fencing and landscaping.
Results
The upgrading for energy efficiency, particularly to the roofs and lighting will achieve significant savings in energy costs and a reduction in the buildings carbon footprint. In addition the floor treatments (repairs and anti-slip) as well as painting and decorating, were carried out using environmentally friendly methods and materials. Careful consideration was also given to the disposal of waste and existing materials by the use of recycling skips, with a different skip for each type of material.
The quality of the works and the standard of finish resulted in the letting of the first unit before completion and the other unit being under offer at the time of completion.
|
|
|
|
 |
|
Disabled Access and facilities – various Court Buildings
The
project
The works involved works to improve access, disabled friendly changes to public areas and the provision of disabled toilets to Bromley, Havering, Stratford, Waltham Forest and Westminster Courts.
Ark build provided external access ramps, handrails internally and externally, changes to internal circulation areas, including doorways, access and fully disabled friendly toilet accommodation.
Results
Ark build completed these works within the environment of busy Court Buildings with the minimum disruption to the daily working of the Courts.
Health & Safety of the public was a major concern and detailed risk assessments and method statements were devised prior to commencement on site.
Communication with the Court Officers was paramount and the attention to careful planning and detailing resulted in delighted end users.
|
|
|
 |
|
Manford Primary school – kitchen refurbishment works
The
project
The works involved the complete refurbishment of the existing kitchen, preparation areas and wet areas.
Ark build provided new kitchen equipment, windows, hygienic wall cladding, washing facilities, toilets, flooring and decoration.
New servery shutters were installed and fire resistant doors fitted.
The dining hall was also refurbished and decorated
Results
A hygienic fully operational new kitchen and adjacent preparation areas.
The dining halls new colour scheme brought a coordinated appeal to the whole area.
The works were completed in 5 weeks, within budget and time restraints.
|
|
|
 |
|
Circle Anglia Ltd – refurbishment
works, Warner Estate
The
project
Complete refurbishment of 29 19th Century street properties
located on the Warner Estate, London E17 - including
double glazing, re-wiring, re-decoration, installation
of new bathrooms, build of new rooms, damp proofing,
replacement of timbers and installation of new carpets
and curtains.
Ark Build conducted comprehensive works in tenant
in-situ, tenant temporary de-camp, and voids situations.
Voids properties were subsequently leased back to
London Borough for Waltham Forest under a PSL scheme.
Results
This project was delivered on time and within budget,
with all works completed to a very high standard.
We made a real difference to Residents by working
in partnership with them and Circle Housing. Ark Build
consulted and engaged with Residents at early and
ongoing stages, and contributed to strong community
spirit via high-quality works, undertaken with respect,
courtesy and in a tidy manner and enabling 100% of
housing stock to be completely modernised.
Our management team won a Silver (Highly Commended)
Royal Institute of Chartered Surveyors, London Region
Award for its work on this project. |
|
|
 |
|
Old Ford Housing Association
– refurbishment of tenanted flats, Mardyke Estat
The
project
Refurbishment of 22 flats to Decent Homes standard.
This consisted of replacement kitchens and bathrooms
(including disabled adaptations through our own in-house
team) to properties transferred from London Borough
of Havering to a new Landlord.
Results
Again, works were performed to a high standard by
Ark Build and within schedule. Excellent client feedback
was received, with a request that future projects
are handled by the same site team!
|
|
|
 |
|
The Wellcome Trust
– refurbishment works, Fulham Road
The
project
Complete refurbishment of existing mixed use freehold
property assets – residential and retail during
an eighteen week period, commencing December 2007
and ending May 2008.
Works included initial, total refurbishment of ground
floor retail properties from new plastering upwards
within a tight timescale of eight weeks. This was
followed by immediate refurbishment of first floor
residential premises on the same basis. All works
were required to be carried out to a very high standard,
including installation in residential properties of
top-of-the-range kitchens.
Results
Our client was delighted with these works. Our tradesmen
and operatives were seen as reliable and works well-managed,
causing minimal disruption to retail tenants and achieving
the high standard required for the project. Attention
to detail was strong and Ark Build worked well with
both residents and neighbours, adopting considerate
approaches whilst ensuring that all work was carried
out safely.
|
|
|
 |
|
|
|