Beavers Community Primary School

The project comprised building a single storey classroom extension with associated toilets and remodelling works to the existing Primary School.

Client

London Borough of Hounslow

Employer’s Agent

Pick Everard

Contract Value

£375,000

Contract Start Date

May 2016

Contract End Date

September 2016

REMODELLING AND EXTENSION

The project comprised building a single storey classroom extension with associated toilets and remodelling works to the existing Primary School. The remodelling and associated work included alterations to an existing plant room to create break out space and cupboard provision, alterations to the existing food servery including asbestos removal, removal of an existing AHU to classroom reception and associated external works and drainage.

Elements included under the Contractors Designed Portion were steelwork connections, concrete structural roof deck, pre-cast beam & block floors and the MEP installations. The robust design was strongly influenced by the need to provide acoustic security due to the close proximity of Heathrow airport and noticeable aircraft noise levels.

The work was undertaken during the school summer term and holiday so daily liaison was required with the school against agreed work plans to minimise disruption to lessons and strict segregation measures were employed to ensure the safeguarding of pupils, staff and visitors. Communication between the school and ourselves was excellent and the project outcome was extremely positive with no incidents, minimal disruption and the delivery of a high quality building providing an invaluable additional reception facility.

Our recent projects

Residential

Sapphire Housing

We delivered a complex design and build residential project for Sapphire Independent Housing in West London, constructing 15 new homes across six constrained garage sites—11 to Passivhaus and 4 to Low Energy standard—using sequential phasing, prefabricated components, and Just-in-Time logistics under a JCT D&B contract with Sectional Completion.

Sapphire Housing

Heritage

Bedford Passage

We were proud to undertake a complex and historically significant three-phase project for University College Hospitals Charity at the Grade II-listed Middlesex Hospital Annex, involving careful demolition, structural preservation, extensive external fabric repairs, and the final conversion of the buildings into high-quality residential apartments.

Bedford Passage

Healthcare

40 Bank Street

The project involves refurbishing and fitting out the first floor of an occupied building in Canary Wharf to create medical facilities, with construction developed from RIBA Stage 4 to Stage 5 and strict adherence to healthcare design standards. Key challenges include designing access for heavy MRI equipment, coordinating complex MEP services in tight spaces, managing noise and storage restrictions, and maintaining rigorous quality controls under a strict Permit to Work regime.

40 Bank Street

Residential

Riverpark Gardens Bromley

A design and build scheme to provide 8 two bedroom apartments on former derelict land, for affordable rent, with gross internal area of some 780m2

Riverpark Gardens Bromley

Residential

Porten Court Hammersmith

We undertook this challenging design and build contract for the London Borough of Hammersmith & Fulham on the Springvale Estate in Porten Road and the outcome has been fantastically well received by the Council and the new residents

Porten Court Hammersmith

Residential

Gatward Green Edmonton

This design and build project for the London Borough of Enfield, involved the re-development of three garage sites to provide 12 new homes for affordable rent and a surface car park for 24no. vehicles.

Gatward Green Edmonton

Do you have a project to discuss?